Luno Bouwadvies

Environmental Permit

Professional guidance for your environmental permit application. From on-site measurement and drawings to submission at the municipality.

24u
Quote delivery
8+
Years experience
€1250
Starting from
100%
Independent

An environmental permit is required for almost every structural modification to your property — from wall openings and roof terraces to extensions, dormers and complete renovations. At Luno Bouwadvies we handle the full permit process: on-site measurement, drawings, coordination with a structural engineer and submission at the municipality. So you know upfront what is possible, what is allowed and what it costs.

What we offer

Feasibility assessment and preliminary consultation with municipality
On-site measurement of the existing situation
Drawings: concept and final
Coordination with structural engineer
Submission and monitoring of the application
Guidance with any objection procedures

Typical applications

Examples of work we regularly handle for our clients.

Wall opening

Removing a load-bearing wall to combine rooms, for example kitchen and living room. Requires a structural calculation — we handle drawings, engineer and application.

Roof terrace

A roof terrace on the flat roof of your home or extension. Usually requires a permit due to aesthetics, privacy and structural load capacity.

Top-up

An extra storey on your existing home — popular in Amsterdam for adding living space. Strict aesthetic rules, and the foundation must also be assessed.

Extension

Extension at the rear or side of your home for extra living space, office or conservatory. Sometimes partially permit-free — we check upfront.

Convert storage to living space

Converting an existing storage or outbuilding into full living space. Changes the property's use category and requires insulation, ventilation and daylight.

Build or renovate

New construction, major renovation or internal reconfiguration of your property. We guide the full process, from feasibility to permit approval.

How it works

1

Quote or free intake

You request a quote or book a free no-obligation intake. We discuss your plans, assess feasibility and provide a clear upfront price.

2

On-site measurement

Our draughtsman visits your property to accurately measure the existing situation: dimensions, constructions, installations — everything needed for correct drawings.

3

Concept drawing

Based on the measurement and your wishes we produce a first drawing. You review it; we iterate until the concept fully matches your plans.

4

Final drawing

Once approved, we produce the final version that meets all requirements of the Dutch Building Decree and local aesthetic regulations.

5

Structural engineer

For structural work (wall openings, dormers, roof terraces) we commission a certified structural engineer for calculations and drawings. We coordinate this for you.

6

Submission at municipality

We submit the complete application digitally via the national Environmental Portal, track the processing time and respond to any questions from the municipality.

Ready to start?

Request a quote within minutes. No obligation, free of charge.

Request quoteFree 15-min intake
Or call directly
+31 6 40 94 11 49
Mon–Fri 8:00–18:00
Pricing

Transparent pricing

No hourly rates, no hidden costs. One fixed price — confirmed before we start.

Environmental Permit
from €1,250

Exact price depends on the complexity of the application. Municipal fees are charged separately.

What's included

  • Feasibility assessment and preliminary consultation with municipality
  • On-site measurement of the existing situation
  • Drawings: concept and final
  • Coordination with structural engineer
  • Submission and monitoring of the application
  • Guidance with any objection procedures
Quote in 24h
Starting price upfront
Full service

Ready to start your project?

Request a free quote or contact us for a personal consultation.